Abdirad, H and Dossick, C S (2019) Normative and descriptive models for COBie implementation: discrepancies and limitations. Engineering, Construction and Architectural Management, 26(08), 1820–36.

Almarri, K, Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(08), 1696–711.

Anson, M, Ying, K T and Siu, M F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(08), 1672–95.

Antwi-Afari, M F, Li, H, Wong, J K, Oladinrin, O T, Ge, J X, Seo, J and Wong, A Y L (2019) Sensing and warning-based technology applications to improve occupational health and safety in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1534–52.

Au-Yong, C P, Chua, S J L, Ali, A S and Tucker, M (2019) Optimising maintenance cost by prioritising maintenance of facilities services in residential buildings. Engineering, Construction and Architectural Management, 26(08), 1593–607.

Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(08), 1777–800.

Gao, J, Ren, H, Ma, X, Cai, W and Shi, Q (2019) A total energy efficiency evaluation framework based on embodied energy for the construction industry and the spatio-temporal evolution analysis. Engineering, Construction and Architectural Management, 26(08), 1652–71.

He, Q, Wang, T, Chan, A P, Li, H and Chen, Y (2019) Identifying the gaps in project success research. Engineering, Construction and Architectural Management, 26(08), 1553–73.

Hilali, A, Charoenngam, C and Barman, A (2019) Barriers in contractual scope management of international development projects in Afghanistan. Engineering, Construction and Architectural Management, 26(08), 1574–92.

Hopkin, T, Lu, S, Sexton, M and Rogers, P (2019) Learning from defects in the UK housing sector using action research. Engineering, Construction and Architectural Management, 26(08), 1608–24.

Jin, R, Zou, Y, Gidado, K, Ashton, P and Painting, N (2019) Scientometric analysis of BIM-based research in construction engineering and management. Engineering, Construction and Architectural Management, 26(08), 1750–76.

  • Type: Journal Article
  • Keywords: Construction; Building information modelling; Information and communication technology (ICT) applications; Constructions education; Integrated practice;
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/ECAM-08-2018-0350
  • Abstract:
    The purpose of this paper is to summarize the latest research of BIM adoption in construction engineering and management (CEM) and propose research directions for future scholarly work. During the recent decade, building information modeling (BIM) has gained increasing applications and research interest in the construction industry. Although there have been review-based studies that summarized BIM-based research in the overall architecture, engineering and construction (AEC) area, there is limited review that evaluates the current stage of BIM-based research specifically in the CEM sub-area. Design/methodology/approach CEM falls into the scope of AEC. It involves construction-related tasks, activities and processes (e.g. scheduling and cost estimates), issues (e.g. constructability), as well as human factors (e.g. collaboration). This study adopted a holistic literature review approach that incorporates bibliometric search and scientometric analysis. A total of 276 articles related to BIM applied in CEM were selected from Scopus as the literature sample for the scientometric analysis. Findings Some key CEM research areas (e.g. CEM pedagogy, integrated project delivery, lean and off-site construction) were identified and evaluated. Research trends in these areas were identified, and analyses were carried out with regard to how they could be integrated with BIM. For example, BIM, as a data repository for ACE facilities, has substantial potential to be integrated with a variety of other digital technologies, project delivery methods and innovative construction techniques throughout the whole process of CEM. Practical implications As BIM is one of the key technologies and digital platforms to improve the construction productivity and collaboration, it is important for industry practitioners to be updated of the latest movement and progress of the academic research. The industry, academics and governmental authorities should work with joint effort to fill the gap by first recognizing the current needs, limitations and trends of applying BIM in the construction industry. For example, it needs more understanding about how to address technical interoperability issues and how to introduce the integrated design and construction delivery approach for BIM implementation under the UK BIM Level 2/3 framework. Originality/value This study contributed to the body of knowledge in BIM by proposing a framework leading to research directions including the differences of BIM effects between design-bid-build and other fast-track project delivery methods; the integration of BIM with off-site construction; and BIM pedagogy in CEM. It also addressed the need to investigate the similarities and differences between academia and industry toward perceiving the movement of BIM in construction field work.

Liang, R and Chong, H (2019) A hybrid group decision model for green supplier selection: a case study of megaprojects. Engineering, Construction and Architectural Management, 26(08), 1712–34.

Murillo, K P, Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(08), 1801–19.

Park, E, Kwon, S J and Han, J (2019) Antecedents of the adoption of building information modeling technology in Korea. Engineering, Construction and Architectural Management, 26(08), 1735–49.

Rajagopalan, G (2019) Durability of alumina silicate concrete based on slag/fly ash blends against corrosion. Engineering, Construction and Architectural Management, 26(08), 1641–51.

Silverio-Fernandez, M A, Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry. Engineering, Construction and Architectural Management, 26(08), 1625–40.